1.Cleaning Up Before You Start 


The essential thing is to control wash the mud and oil off the region I will work on getting all the dirt out of the strings. Exactly when you're managing the floor without a lift having huge groups of mud and oil drop all finished and in your eyes isn't flawless. Next, sprinkle all the wanderer pieces with WD-40 or PB Blaster and let it ingest. This will save you a great deal of work endeavoring to clear stuck shocks. At the point when you oust the nuts, screws, and washers clear off the strings and wipe all the filth off the washers. 




2.Removing the Ball Joint 


Using a 9/16" connection and wrench empty the 4 top shocks. additionally, pull out the turning extremity. Yea right! In case you never did one of these you're in for a stun. The turning extremities are in general immovably arranged in fixed openings. You will require a turning conjuncture separator regardless called a pickle fork to get the uppers off. You can thrash the cuts out for the count with a significant sledge anyway the half shaft is hindering using a hammer on the uppers. 


Empty the cotter pin and opened nut (15/16" connection) from the lower latch and toss out the old pin. Take a 15/16" turning extremity separator (pickle fork) and whack it with a considerable sledge until the pivoting conjuncture jumps up out of the fixed opening. The prepared focus point will drop down outside of what might be expected maintained by the lower turning extremity. You would now have the option to pull the old turning conjuncture up and out of the upper control arm. 


3.Installing a New Upper Ball Joint 


Clean all junk around the hole in the inside point and the upper control arm. Drop the new turning member into the opening in the upper control arm. Guarantee that the downpour boot doesn't get pressed in the control arm opening. Push it down clear through. 


Shock the Ball joint to the middle first and a short time later to the An arm. 


Put a little jack under the prepared focus and raise it until the new turning member shock is through the upper equipped focus hole. Hand fix the opened nut. 


Line up the new turning limb and drop the 4 shocks and washers into the openings. Fix the shocks to 37 ft-lbs. Fix the 15/16" clasp to 73 ft-lbs while organizing the space in the nut with the opening in the screw. Fix the nut to mastermind it; never loosen. Supplement another cotter pin. 


4.Removing the Lower Ball Joint 


Note: If your vehicle has only one turning limb (most do) this is your framework. 


Notice that the shocks on the front lower pivoting conjuncture are not all going up against a comparative bearing. The outside shocks have their heads turning upward. On the back, the nuts are overall turning upward. The lower turning conjuncture shocks are a startling size in contrast with the upper shocks. The screw heads take a 5/8" and the nuts take a 11/16" wrench. Clear the 4 shocks that hold the lower turning member to the lower control arm. 


The 2 shocks on the terminations are the hardest ones to oust. It's difficult to get a wrench on the shock underneath the turning member in light of the fact that the control arm folds over it. I used a thick Craftsman open-end wrench pushed on the hex vertically. One of the nuts was so close I expected to warm it up with a propane light. Oust the cotter pin from the opened nut and unscrew the nut using a 15/16" socket. 


Raise the lower control arm up truly high (not the prepared focus point) with a jack and hammer the pivoting limb till it relaxes up. Lift the arm fairly more and pull the base of the equipped focus point away from the control arm while pulling and turning the pivoting member up and out sideways. 


5.Installing the Lower Ball Joint 


Contort the new joint directly over aside. Distort the joint around 90 degrees and it will drop into the hole in the lower furnished focus point. The main event when I endeavored to put one in I endeavored to get it in straight and it found a good pace and stuck on a little edge which is a bit of the furnished focus anticipating. The lower joint goes under the lower control arm. 


Start the opened nut on the base turning extremity. Slip the turning limb under the lower control arm, line up the openings and displace the 4 nuts, latches and 8 washers. Power these to 65 ft-lbs. Remember that the outside 2 shocks are heads up on the front. Fix the 15/16" opened nut to 73 ft-lbs while masterminding the space in the nut with the hole in the clasp. 


Oil all the turning extremities until oil floods out of the seal. Present your wheels, cut down the jacks and you're good to go. You ought to get your plan checked.


We have first-class production line and strict management system.

Contact Us

江苏四通机械制造有限公司
Jiangsu Sitong Cardan Shaft Co.,LTD
Tel : +86-523-84549777
Phone : +86-18852632222
E-mail : lynn@cardanshaft.com.cn
Whatsapp : +86-18852632222
Skype : sales@nskfagbearings.com
QQ : 510994342

Contact Us

Copyright 2020  Jiangsu Sitong Cardan Shaft Co.,Ltd All Rights Reserved. 网站地图 Sitemap